[[bpstrwcotob]]


Early Planning Underway for UofL’s Collaborative Research Hub

The University of Louisville’s planned Center for Bioscience is entering early planning, with the future project team yet to be selected as university leaders define the goals, research needs, and collaborative vision for the 70,000-sf facility

Read More

Decarbonizing Labs Through Thermal Energy Networks

As laboratories face growing pressure to decarbonize, thermal energy networks offer a path beyond building-by-building electrification. Charlie Marino and Victor Sanchez shared how campuses can leverage shared infrastructure, heat recovery, and strategic planning to reduce emissions, during their 2026 Lab Design Conference session

Read More

Laboratories Need an Identity Layer for Their Building Records

A structural failure during a Manhattan building conversion exposed the risks of disconnected facility records. For laboratories, where spaces evolve constantly, maintaining a continuous history of every system and modification may require a new approach to how facility identity is managed

Read More

Designing Life Sciences Real Estate for Growth and Talent

As life sciences companies evolve and competition for talent intensifies, developers are rethinking laboratory campuses with adaptable infrastructure, faster occupancy, and employee-focused environments

Read More

Professional Profile: Josh Hirshenhorn

Josh Hirshenhorn of Precis Engineering + Architecture discusses how quality requirements, collaboration, and long-term planning are shaping the future of life sciences facilities and influencing the way teams approach laboratory design and upgrades

Read More

Lab Users Shape Carnegie Mellon’s New Labs

By involving teaching faculty and laboratory users throughout planning, Carnegie Mellon transformed years of experience in outdated spaces into a new learning environment designed around student workflows, collaboration, and flexibility

Read More