[[bpstrwcotob]]


Designing a TEM Facility: What to Consider Before the Microscope Arrives

Bringing transmission electron microscopy in-house requires more than selecting the right instrument. Learn how early planning for vibration control, room location, infrastructure, sample preparation, and stakeholder coordination can protect image quality and prevent costly design changes

Read More

Lab Renovations Require More Than a Fresh Coat of Paint

Lab renovations can uncover code compliance issues, aging infrastructure, and operational challenges. Melody Wang of EXP and Tzveta Panayotova of HDR explain how early planning can help teams manage risks, control costs, minimize disruptions, and prepare labs for future needs

Read More

A Lab Expansion Planned Around End-User Needs, Future Growth

A $17 million project in Columbia, S.C., adds analytical chemistry space and expands microbiology capabilities while maintaining existing laboratory operations

Read More

From Research to Pilot Scale at UMass Amherst’s Food Innovation Hub

The Food Innovation Hub at UMass Amherst will bring research, pilot-scale food processing, product development, teaching, and industry engagement under one roof, with flexible spaces and specialized infrastructure designed to support an evolving food research ecosystem

Read More

Liverpool Accelerate Laboratory Integrates Robotics With High-Containment Research

A new £20 million facility in Liverpool integrates CL3 containment, robotics, AI, and flexible infrastructure to advance infectious disease research

Read More

Research Building Upgrade Balances Energy Recovery and Continuous Lab Operations

A phased infrastructure upgrade at the University of Maryland, Baltimore’s Bressler Research Building replaced aging exhaust and heat recovery systems while keeping the occupied research facility fully ventilated throughout construction

Read More

UH’s Next Chapter in Medical Research

New 54,000-sf facility will bring wet-lab, computational, clinical and behavioral research together, with early planning focused on adaptability, infrastructure and long-term performance

Read More

Planning for Liquid Nitrogen: Integrating LN₂ Infrastructure into Laboratory Design 

Early planning for liquid nitrogen systems can help laboratory teams reduce costs, avoid construction delays, and maintain safe, reliable service

Read More

When Old Buildings Become New Labs

Renovating an existing building into a high-performing laboratory requires more than creative design—at the 2026 Lab Design Conference, Cody Henderson shared practical lessons on evaluating existing facilities, overcoming renovation challenges, and building flexibility and sustainability into every project

Read More