[[bpstrwcotob]]


Successful Lab Projects Start Before the Project Begins

At the 2026 Lab Design Conference, Geisinger’s April Day urged laboratory leaders, planners, and designers to engage stakeholders early—and come to the table armed with data, questions, and lessons learned

Read More

Designing a TEM Facility: What to Consider Before the Microscope Arrives

Bringing transmission electron microscopy in-house requires more than selecting the right instrument. Learn how early planning for vibration control, room location, infrastructure, sample preparation, and stakeholder coordination can protect image quality and prevent costly design changes

Read More

New Research Feedlot Connects Animal Science and Technology

West Texas A&M University's new research feedlot combines input from experienced researchers and industry stakeholders with a design intended to support evolving research methods and future technologies

Read More

First Lab Build? Start Here

Planning your first laboratory build or renovation? Learn how to assemble the right team, establish project goals, navigate design decisions, and avoid common pitfalls in this free expert-led webinar

Read More

A Lab Expansion Planned Around End-User Needs, Future Growth

A $17 million project in Columbia, S.C., adds analytical chemistry space and expands microbiology capabilities while maintaining existing laboratory operations

Read More

The Beauty of Manufacturing: How New England Biolabs Integrated Process, Culture, and Place

A presentation at the 2026 Lab Design Conference examined how New England Biolabs integrated flexible laboratories, manufacturing, automation, and connections to nature into its Garden facility expansion

Read More

Montclair State Breaks Ground on $120 Million Interdisciplinary Science Building

The 110,000-sf facility will expand science teaching and research space while giving the university more flexibility to support changing programs and interdisciplinary work

Read More

UH’s Next Chapter in Medical Research

New 54,000-sf facility will bring wet-lab, computational, clinical and behavioral research together, with early planning focused on adaptability, infrastructure and long-term performance

Read More