[[bpstrwcotob]]
How Operational Excellence Elevated UNLV Facility to LEED Platinum
What transformed a LEED Silver medical education building into a LEED Platinum facility? The answer wasn't a redesign—it was what happened after occupants moved in
Lab End Users Share Why Peer Learning Matters: On the Floor at the Lab Design Conference
Laboratory leaders share how active expansion projects brought them to the Lab Design Conference—and why learning from peers and the design community can lead to more efficient, future-ready labs
Modernizing a Teaching Lab: Lessons from a Facility Upgrade
UMass Dartmouth’s Fluids Lab upgrade highlights how stakeholder input, modern equipment, and strategic funding can help institutions create more industry-relevant learning environments
Moving Science Closer to Patients
Designed to bring researchers, clinicians, students, and the community together, Victoria University’s new Research Building supports a wide range of health research disciplines under one roof
Stakeholder-Driven Design: Planning an Integrated Cancer Research and Care Hub
As Stanford Medicine advances its proposed integrated cancer center, early planning is highlighting how workflow-driven design and cross-disciplinary stakeholder input are shaping a flexible model for next-generation cancer research and care
From Warehouse to Scale-Up Facility
OMX’s retrofit laboratory and scale-up facility in Bristol, UK is designed to support growing deep tech companies and address the lack of mid-scale lab space in the region
How Early Collaboration Shapes High-Performance Research Facilities
Early, intentional collaboration—through stakeholder alignment, iterative engagement, and thoughtful programming—enables lab projects to move beyond basic requirements and deliver flexible, high-performing research environments that stay on schedule, on budget, and aligned with user needs
After the Webinar: What Owners Should Know About Occupied Lab Renovations
Occupied lab renovations succeed when owners prioritize early validation of existing conditions, integrate design and construction planning (especially for phasing and temporary systems), and maintain constant communication to minimize downtime and protect ongoing research
Why Lab Pros Keep Coming Back: 25 Years of the Lab Design Conference
The 25th annual Lab Design Conference, taking place May 11-14 in Orlando, brings together end users planning lab projects and the design and project teams who serve them for AIA-accredited sessions and networking focused on collaboration, connection, and advancing lab design
Integrating Diagnostics and Genetics Through Laboratory Design
Dynacare’s new precision medicine laboratory in Laval’s Biotech City consolidates diagnostic and genetics operations into a user-centered, highly integrated facility that enhances collaboration, streamlines workflows, maintains service continuity during transition, and advances efficient, patient-focused care
