[[bpstrwcotob]]
UH’s Next Chapter in Medical Research
New 54,000-sf facility will bring wet-lab, computational, clinical and behavioral research together, with early planning focused on adaptability, infrastructure and long-term performance
Massasoit Carries Science Building Lessons Into Next Project
Massasoit Community College’s completed Science Building is informing the design and planning of a new Health Science Building, the next phase of the college’s $52 million Transformation Through Renovation Project
When Old Buildings Become New Labs
Renovating an existing building into a high-performing laboratory requires more than creative design—at the 2026 Lab Design Conference, Cody Henderson shared practical lessons on evaluating existing facilities, overcoming renovation challenges, and building flexibility and sustainability into every project
Start With the Equipment List: On the Floor at the Lab Design Conference
At the 2026 Lab Design Conference, Geisinger’s April Day shared practical advice on equipment planning, collaboration, and preparing for successful laboratory projects
A Strategic Blueprint for Science Infrastructure: Inside a $100M+ Science Complex Expansion
From enrollment bottlenecks to modular lab design: How ISU is aligning institutional goals with flexible infrastructure for its 2027 groundbreaking
The Question Your Lab Design Kickoff Is Missing
More client input doesn’t necessarily lead to better lab design—an operational gatekeeper can help design teams get the right information, from the right people, at the right time, before critical decisions are locked in
Designing Labs for What Comes Next: Inside a 15-Year Masterplan
Ireland’s Technological University of the Shannon is planning new research facilities, postgraduate hubs and industry-facing innovation spaces while using adaptive reuse and flexible planning to accommodate changing research needs
Early Planning Underway for UofL’s Collaborative Research Hub
The University of Louisville’s planned Center for Bioscience is entering early planning, with the future project team yet to be selected as university leaders define the goals, research needs, and collaborative vision for the 70,000-sf facility
Turning Industrial Space into a Modern Lab
Converting industrial space into a high-performance laboratory requires more than infrastructure upgrades. At the 2026 Lab Design Conference, Mukesh Jani explained why stakeholder engagement, healthy workplaces, and long-term planning were the keys to success
Stakeholder-Driven Planning Transforms Former Sears into Research Hub
LSU Health Shreveport is engaging researchers early in the planning process as it transforms a former Sears building into 181,000 sf of flexible research space
