Hudson Lab Automation’s new headquarters in New Providence, NJ, brings engineering, production, service, and commercial teams together under one roof. Image: Hudson Lab Automation
Hudson Lab Automation’s new headquarters in New Providence, NJ, was designed to do more than provide additional space. The facility brings the company’s engineering, production, service, and commercial teams closer together while creating a dedicated laboratory environment where customers can explore automation technologies and workflows.
For CEO Werner Maas, who joined the company two years before the October 2026 opening, the move was an opportunity to unite three businesses: Hudson Robotics, Art Robbins Instruments, and Tomtec. The goal was to create a headquarters that could support their combined capabilities while accommodating future growth.
“We wanted a facility that would inspire innovation,” Maas says. “Bringing service, production, marketing, and engineering into close proximity creates opportunities to exchange ideas, solve problems, and connect customer experience with product development.”
The project also offers a practical example of how a company can approach facility planning with limited resources, drawing on internal operational knowledge and outside expertise to make decisions about space, furnishings, and construction.
Starting with workflows and employee expertise
Hudson incorporated employee input into the facility layout, using operational expertise to guide space allocation, material flows, and work area arrangements. Image: Hudson Lab Automation
Hudson based its space allocation on current requirements but planned for a company twice its present size. Quality control and production received additional capacity to accommodate anticipated increases in volume and a broader product portfolio.
Rather than handing the design process entirely to outside consultants, Hudson worked jointly with Kimmerle Newman Architects to develop the layout. The company defined its functional areas, determined their sizes, mapped material flows, and considered how employees would move between offices and operational spaces.
Employee input on workflow was central to that process. Hudson consulted key team members about movement through the facility, while the operations team contributed directly to the arrangement of its work areas. Marketing, sales, and service personnel also brought relevant experience and perspectives to the planning.
“Our internal team brought knowledge of our equipment and day-to-day activities, while Kimmerle helped translate those needs into a building design,” Maas notes.
That division of responsibilities allowed Hudson to retain control of decisions rooted in its operations while relying on architectural expertise to translate those requirements into building plans. The teams also worked together to define electrical, lighting, and connectivity requirements, translating employees’ day-to-day operational needs into practical design decisions before construction began.
Designing a lab for customers, not just demonstrations
The Hudson Customer Experience Center provides a dedicated laboratory environment for customer training, equipment demonstrations, and integrated workflow evaluations. Image: Hudson Lab Automation
A defining feature of the new headquarters is its Hudson Customer Experience Center, which gives customers and partners a place to evaluate automation technologies in a working laboratory environment.
Maas brought a lesson from previous facility projects to the design: customer-facing spaces should resemble the environments in which customers will actually use the equipment.
“I wanted customers to experience our equipment in a setting that resembled their own laboratories,” he says.
The resulting space was planned to be light, clean, and welcoming, with room for training and both virtual and in-person demonstrations. Rather than simply displaying individual instruments, the center allows Hudson to demonstrate integrated workflows and bring customers together with its applications and engineering experts.
Meeting rooms and smaller huddle spaces throughout the facility support collaboration without requiring employees to leave their work areas. For larger gatherings, Hudson can rent a separate meeting space in the building, avoiding the need to dedicate its own footprint to a large conference room used only occasionally.
Making cost-conscious property and furnishing decisions
Refurbished laboratory benches and office furnishings helped Hudson control costs while creating spaces tailored to its operational needs. Image: Hudson Lab Automation
The choice of building was another important part of the design strategy. Hudson considered industrial properties but found that their typical triple-net lease arrangements would have required substantial upfront investment in improvements. Because the company primarily performs light assembly, testing, and integration, with components such as electronic boards and machined parts manufactured externally, it did not need extensive specialized building infrastructure.
An office building offered a more suitable financial arrangement, including a tenant-improvement allowance that enabled Hudson to customize the layout while preserving cash. The selected property also had a dedicated loading dock, which Maas considered essential. Lower ceiling heights did mean allocating more floor space to inventory storage.
Hudson applied the same cost-conscious approach to furnishings. Furniture X-change supplied refurbished office desks and cubicles, while National Laboratory Sales provided refurbished laboratory benches. Both enabled the company to obtain high-quality furnishings at a fraction of the cost of new products without compromising its planned layout.
Planning for growth and unexpected delays
The new headquarters includes expanded quality control and production areas designed to accommodate anticipated increases in volume and future growth. Image: Hudson Lab Automation
The building owners managed construction, which was carried out by a third-party contractor. Completion came approximately two months later than planned, forcing Hudson to extend its previous lease three times and contributing to some production disruptions during the transition.
Once the team gained access to the new facility, it accelerated the move and was nearly fully operational by the third week.
For Maas, the experience reinforced the need to coordinate construction schedules with relocation preparations and production continuity. His advice to other companies planning similar projects is to consider the property, lease terms, layout, and furnishings as interconnected decisions rather than separate exercises.
At Hudson, that approach produced a facility designed around existing workflows, employee collaboration, customer engagement, and future capacity, without requiring every element to be purchased or built from scratch.
