[[bpstrwcotob]]
Designing Space for Research to Grow
A $35 million expansion and renovation will add flexible research space, upgrade laboratory infrastructure, and create new opportunities for education and collaboration at the West Virginia School of Osteopathic Medicine
Free Digital Event: Practical Ways to Improve Existing Labs
Lab Design’s free October 14 event will offer strategies for improving laboratory performance, planning cost-effective upgrades, and minimizing operational disruption
What Post-Occupancy Experience Reveals About Designing for Research
Months after opening, Chesapeake Bay Hall is demonstrating how thoughtful decisions around infrastructure, flexibility, collaboration, and occupant experience can shape the long-term performance of a research facility
After the Webinar: What Owners Should Know About Occupied Lab Renovations
Occupied lab renovations succeed when owners prioritize early validation of existing conditions, integrate design and construction planning (especially for phasing and temporary systems), and maintain constant communication to minimize downtime and protect ongoing research
