[[bpstrwcotob]]
A Lab Expansion Planned Around End-User Needs, Future Growth
A $17 million project in Columbia, S.C., adds analytical chemistry space and expands microbiology capabilities while maintaining existing laboratory operations
Research Building Upgrade Balances Energy Recovery and Continuous Lab Operations
A phased infrastructure upgrade at the University of Maryland, Baltimore’s Bressler Research Building replaced aging exhaust and heat recovery systems while keeping the occupied research facility fully ventilated throughout construction
Designing Space for Research to Grow
A $35 million expansion and renovation will add flexible research space, upgrade laboratory infrastructure, and create new opportunities for education and collaboration at the West Virginia School of Osteopathic Medicine
Free Digital Event: Practical Ways to Improve Existing Labs
Lab Design’s free October 14 event will offer strategies for improving laboratory performance, planning cost-effective upgrades, and minimizing operational disruption
What Post-Occupancy Experience Reveals About Designing for Research
Months after opening, Chesapeake Bay Hall is demonstrating how thoughtful decisions around infrastructure, flexibility, collaboration, and occupant experience can shape the long-term performance of a research facility
After the Webinar: What Owners Should Know About Occupied Lab Renovations
Occupied lab renovations succeed when owners prioritize early validation of existing conditions, integrate design and construction planning (especially for phasing and temporary systems), and maintain constant communication to minimize downtime and protect ongoing research
