[[bpstrwcotob]]


A Lab Expansion Planned Around End-User Needs, Future Growth

A $17 million project in Columbia, S.C., adds analytical chemistry space and expands microbiology capabilities while maintaining existing laboratory operations

Read More

Research Building Upgrade Balances Energy Recovery and Continuous Lab Operations

A phased infrastructure upgrade at the University of Maryland, Baltimore’s Bressler Research Building replaced aging exhaust and heat recovery systems while keeping the occupied research facility fully ventilated throughout construction

Read More

Designing Space for Research to Grow

A $35 million expansion and renovation will add flexible research space, upgrade laboratory infrastructure, and create new opportunities for education and collaboration at the West Virginia School of Osteopathic Medicine

Read More

What Post-Occupancy Experience Reveals About Designing for Research

Months after opening, Chesapeake Bay Hall is demonstrating how thoughtful decisions around infrastructure, flexibility, collaboration, and occupant experience can shape the long-term performance of a research facility

Read More

After the Webinar: What Owners Should Know About Occupied Lab Renovations

Occupied lab renovations succeed when owners prioritize early validation of existing conditions, integrate design and construction planning (especially for phasing and temporary systems), and maintain constant communication to minimize downtime and protect ongoing research

Read More