Advertisement

February 2014 Issue of Laboratory Design Newsletter
February 2014 Issue of Laboratory Design NewsletterThis month's issue of Laboratory Design Newsletter features a cover story on remaking engineering buildings, repositioning strategies for success. Other features include information on successful lab equipment moves, how new buildings are re-defining research and collaboration, how BIM bridges the collaboration gap and how science lab design standards create consistency.

Click Here for Digital Edition

Links to HTML Articles

Cover Story:
Remaking the engineering building: Repositioning strategies for success

Feature Stories:
Where does all this stuff go... and how do we get it there?
From Big 10 to Big 3
BIM bridges the collaboration gap
Where all labs are created equal: Science lab design standards create consistency

Advertisement
Advertisement